![](/assets/Uploads/_resampled/bannerlowW10/ResizerImage1500X880-2.jpg)
Project Technical Info
-
Completion Date:
2021
-
Architect:
Williams
-
Main Contractor:
Apollo Projects
-
Square metres:
24.000m2
-
Engineer:
Connor Consulting, slab design by Conset
-
Cubic Meters:
10,000m3
![](/assets/Uploads/_resampled/verticallowW10/DJI-262.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/ResizerImage1500X880-4.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/IMG-2588.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/IMG-6564.jpeg)
![](/assets/bulkUpload/_resampled/bannerlowW10/IMG-6563.jpeg)
![](/assets/bulkUpload/_resampled/bannerlowW10/ResizerImage1500X881.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/IMG-6566.jpeg)
![](/assets/bulkUpload/_resampled/bannerlowW10/ResizerImage1500X880-5.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/ResizerImage1500X880-6.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/ResizerImage1500X880-7.jpg)
![](themes/conset/images/260.png)