![](/assets/Uploads/_resampled/bannerlowW10/ResizerImage1500X880.jpg)
Project Technical Info
-
Completion Date:
2019
-
Main Contractor:
MacRennie Construction
-
Square metres:
55,000m2
-
Engineer:
Day Consulting Engineers, slab design by Conset
-
Cubic Meters:
15,000m3
![](/assets/Uploads/_resampled/verticallowW10/IMG-2698.jpeg)
![](/assets/bulkUpload/_resampled/bannerlowW10/7.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/6.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/3-Copy.jpg)
![](/assets/bulkUpload/_resampled/bannerlowW10/ResizerImage1500X880-12.jpg)
![](themes/conset/images/260.png)